The Hidden Cost of Poor Monitoring Design: Why Instrument Location and Installation Matters More Than Quantity

Ali Siamaki

In geotechnical and structural engineering, the maxim "you can't manage what you don't measure" is a fundamental truth. However, in the pursuit of comprehensive risk mitigation, a dangerous misconception often takes root: that the sheer quantity of monitoring instruments directly correlates with the quality of insights. This flawed logic frequently results in high expenditures, data overload, and, critically, misleading data—the hidden cost of poor monitoring design.

For forward-looking managers, engineers, and decision-makers, it's time to shift the focus from a scattergun approach to a precision strategy. Effective monitoring is not about instrument count; it is about the strategic design of the monitoring network, prioritizing critical parameters at critical locations with the right technology and flawless installation.

Misplaced Instruments: False Confidence in Stability

Geotechnical instruments like piezometers, inclinometers, and extensometers are designed to capture specific, localized phenomena: pore water pressure, lateral subsurface deformation, and vertical displacement, respectively. Their value is intrinsically tied to their position relative to the anticipated zone of influence (ZOI) or failure plane.

When a monitoring plan is driven by an indiscriminate desire for "full coverage," the following problems invariably arise:

  1. Misleading Data from Misplacement: An inclinometer casing installed just outside a critical shear zone, or a piezometer tip set in an unintended, non-representative soil layer due to an installation error, will record data that is technically accurate for its physical location, yet completely misleading for the critical parameter it was intended to capture. For instance, an extensometer anchor not securely fixed below the moving ground can produce settlement readings that mask true deeper displacement or, conversely, indicate movement where none exists. This "garbage in, garbage out" scenario creates a false sense of security or triggers unnecessary, costly alarm responses.

  2. Dilution of Critical Insight: Too many sensors, particularly in non-essential areas, flood project teams with irrelevant data. This volume-over-value approach taxes data acquisition systems, complicates processing, and diverts valuable engineering time away from the meticulous analysis of the few genuinely critical instruments. The actual signs of impending structural or ground behaviour change are often buried under a mountain of insignificant readings.

The Precision-Driven Monitoring Paradigm

The future of geotechnical and structural monitoring lies in a disciplined, analytical, and three-step design approach that elevates strategic placement and installation integrity above mere quantity.

1. Pinpoint the Critical Parameter and Location

Before selecting a single sensor, the monitoring objective must be defined through a rigorous analysis of the ground model and design assumptions.

  • Identify the Critical Zone of Influence (ZOI): Based on the geotechnical analysis, define the precise locations (e.g., predicted slip surfaces, maximum stress concentration points, areas of differential settlement) where the structure or ground is most vulnerable to change.

  • Define the Critical Parameters: Determine which parameters are the primary indicators of risk. Is it a change in pore pressure leading to a reduction in shear strength (requiring targeted piezometers), or is it a progressive lateral movement that could lead to failure (requiring precisely located inclinometers)?

  • Establish the Sensor Series: To fully understand the mechanism of change, it is often necessary to use a series of instruments, strategically placed to create a profile:

    • Near-Field vs. Far-Field: Install sensors both within the critical zone and extending outside the ZOI. This series provides a vital baseline, distinguishing between localized, critical movement and regional or environmental background changes (e.g., changes in the overall water table far from the structure).

    • Baseline Calibration: Instruments in stable ground serve as indispensable references, allowing for the isolation of true project-induced behaviour from natural or environmental fluctuations, such as those caused by temperature or rainfall.

2. Right Instrument, Right Range, Flawless Execution

The selected instrument must be fit-for-purpose, with performance specifications aligned with the anticipated magnitude and rate of change.

  • Range and Resolution Match: A high-precision extensometer is overkill for a massive, slow-moving landslide, while a low-resolution inclinometer is useless for tracking sub-millimeter movement in a deep urban excavation. Select the instrument whose range, resolution, and accuracy are optimized for the predicted behaviour.

  • Installation Integrity is Paramount: Poor installation creates an immediate data failure. This includes:

    • Piezometers: Ensuring the filter tip is seated precisely within the intended water-bearing stratum and isolating it with proper bentonite seals to prevent hydraulic short-circuiting.

    • Inclinometers: Maintaining casing verticality and non-spirality during grouting to ensure that the initial zero reading is reliable, and the casing is robustly coupled across the expected shear zone.

    • Extensometers: Confirming that the deepest anchor is correctly set in truly stable ground and that the borehole backfill does not constrain or distort the measuring rod.

A Forward-Looking Approach

The decision to install 50 moderately placed instruments instead of 15 strategically placed and perfectly installed ones is a false economy. It creates a brittle monitoring system that is difficult to manage and prone to catastrophic misinterpretation.

A successful monitoring program is an exercise in applied engineering intelligence. It requires an initial investment in detailed analysis, the selection of the right sensor technology for the job, and an absolute commitment to rigorous, quality-controlled installation. By prioritizing location, integrity, and insight over mere quantity, we move beyond passive data collection to a proactive, reliable, and truly risk-mitigating observational method, ultimately delivering greater project safety, economic efficiency, and engineering confidence.